IT'S AN ON-SITE VISIT, NOT A FORM AND A PHONE CALL. HERE'S WHAT HAPPENS IN THREE HOURS, WHAT NUMBERS TO BRING, AND WHEN YOUR REPORT ARRIVES.
The assessor’s car pulls into the lot at 8:00 on a Wednesday. The plant manager meets him at the door and walks him past line two, the one that’s been stopping without warning since spring. Then comes the question he knew was coming: about how much does each of those stoppages cost you? The answer is somewhere between the maintenance lead, the scheduler, and a spreadsheet nobody has opened since July.
The short answer: A CIRAS Industry 4.0 assessment is an onsite visit of about three hours, so plan for up to four. An assessor learns your operation, helps you identify where Industry 4.0 technology could solve real problems, and talks through the expected impact. A tailored report follows about two weeks later. A completed assessment is required to apply for Iowa’s Manufacturing 4.0 grant, and the last day to request one is November 20, 2026.
If you’ve requested an assessment or are about to, this post walks through what happens, what to have ready, and why the preparation matters more than most people expect.
An assessor from CIRAS, Iowa State University’s industry extension service, comes to your facility to learn how your operation works and where it struggles. From there, they help you identify and document opportunities across robotics, automation, IoT, sensors, advanced software, and more.
For each opportunity, you’ll talk through the expected impact: cost savings, productivity, labor, or quality improvements. That conversation is the heart of the visit. It isn’t a sales call and it isn’t an inspection. It’s a structured look at your plant with someone whose job is to help Iowa manufacturers figure out what’s worth doing.
Plan for three to four hours on-site. CIRAS describes the visit as about three hours, and its request form says to plan for three to four.
The scheduling takes longer than the visit. When you request an assessment, you offer five candidate dates within the next three to four weeks. The report then follows about two weeks after the visit. So from request to report, expect roughly five to six weeks.
| Step | Timing |
| Request the assessment | By November 20, 2026 |
| On-Site Visit | Within three to four weeks of your request |
| Tailored Report Delivered | About two weeks after the visit |
| Grant application open | January 4, 2027 |
| Applications due | January 29, 2027 |
CIRAS has confirmed that any company requesting an assessment by November 20 will have its report before applications open on January 4. A request on the 19th still gets you there. It just gives you less room in January to turn the report into an application.
Bring numbers. CIRAS asks companies to have relevant numbers or estimates related to expected impact ready to discuss during the visit, if possible.
This is the part most plant managers aren’t ready for. Not because they don’t know their operation. They know it better than anyone. It’s that nobody tracks what a recurring stoppage costs in a form you can hand to someone in a conference room. The numbers live in people’s heads and in three different systems.
You don’t need perfect figures. A reasonable estimate with the math shown is more useful than a precise number nobody can explain. Here’s where to start:
Pick the two or three that matter most to your plant and get a number for each. Ask your maintenance lead, your scheduler, and whoever runs payroll. Twenty minutes with each of them usually gets you there.
Bring the person who knows the problem best and the person who will sign off on fixing it. In a small plant, that might be one person. In a larger one, it’s usually the plant or operations manager, plus the owner or CFO for at least part of the visit.
It also helps to have whoever handles your IT and network nearby, even if it’s an outside provider. Many Industry 4.0 opportunities depend on getting data off a machine and onto a network, and questions about what’s possible come up quickly.
The request form is short, but a few things on it surprise people.
You get a report tailored to your facility’s top Industry 4.0 opportunities, about two weeks after the visit. CIRAS calls the report a key part of the grant application.
That’s why the preparation matters. The numbers you bring shape the conversation, the conversation shapes the report, and the report feeds an application that’s scored against everyone else’s. A visit where you walk in with clear numbers for one real problem tends to produce a report that points at a fundable project. A visit where you’re guessing tends to produce a list.
We don’t perform the CIRAS assessment, administer the grant, or score applications. What we can do is help you get ready for the visit: sort out which problem to lead with, rough out the numbers, and work out what technology might actually fix it, so the answer on the request form is one you believe.
That’s what the Manufacturing 4.0 Scoping Call is for. Thirty minutes with a Koltiv engineer, before CIRAS arrives.
A CIRAS assessor visits your facility to learn your operation, helps identify and document opportunities across robotics, automation, IoT, sensors, and advanced software, and discusses the expected impact of each one on cost, productivity, labor, or quality. A tailored report follows the visit.
The onsite visit takes about three hours, so plan for up to four. You’ll offer five candidate dates within three to four weeks of your request, and the report arrives about two weeks after the visit.
CIRAS asks you to bring any relevant numbers or estimates about expected impact, such as the cost of downtime, scrap and rework rates, hours spent on manual work, or inventory accuracy. Reasonable estimates with the math shown are fine.
The report generally arrives about two weeks after the onsite visit. CIRAS has confirmed that any company requesting an assessment by November 20, 2026, will have its report before grant applications open on January 4, 2027.
Yes. An onsite Manufacturing 4.0 assessment is required even if CIRAS has assessed your company in the past.
Most of the plant managers we talk to already know where their operation hurts. What’s usually missing is the number that goes with it. Three hours with a CIRAS assessor is a real chance to get an outside set of eyes on your floor, and it’s worth walking in ready. If you’d like help figuring out which problem to lead with and what it’s costing you, give us thirty minutes before the visit. If your numbers say the grant isn’t the right fit, we’ll tell you that too.
Discover how to effectively utilize the Iowa Manufacturing 4.0 Grant to solve your manufacturing challenges with the right technology solutions.
Find out more about the eligible cybersecurity expenses that a recipient of the Iowa Manufacturing 4.0 Technology program allows - Des Moines (IA)
Find out more about the Iowa's Manufacturing 4.0 Grant and why the real deadline is November 20, 2026 and more.
Discover why your Downtime Calculator is essential for operational efficiency. Learn to identify digital waste and reclaim valuable production hours.